CHECKLISTS AND TOOLS

NEC programme checklists and tools

Checklists, tools and sample reports for contractor teams on NEC4, FIDIC and JCT jobs, grouped by the stage of the job.

The NEC4 early warning register template in Excel in front of a pre-construction pack and a programme compliance review from a demo project

DIRECT DOWNLOAD

NO EMAIL NEEDED

CLAUSE REFERENCED

NEC ACCREDITED

APMG QUALIFIED

P6 / MS PROJECT / ASTA

NEC / JCT / FIDIC

NEC4 early warning register template in Excel, with example matters scored for time impact and proximity

NEW TEMPLATE

NEC4 early warning register template

Each matter gets one row: its source, the clause 15.1 tests it could trigger, scores for time impact, proximity and probability, the programme activities it threatens and the action, owner and due date. A Meetings tab checks the clause 15 timetable from the starting date and the Contract Data interval. A Summary tab gives the counts for the monthly report.

Excel workbook, 5 tabs

Covers: NEC4 ECC 11.2(8), 15.1 to 15.4, 61.5 and 63.7, with a note on NEC3

plan

PLAN

Pricing a tender and preparing to start

The tender programme decides the time-related costs in the price. The first programme after award starts from it. These help you get both right.

TOOLS TO DO IT YOURSELF

First page of the tender programme checklist

CHECKLIST

Tender programme checklist

PDF, 2 pages

Checks a tender programme before the bid goes in: dates and constraints, logic and durations, price against programme and the steps after award.

Covers: NEC4 ECC 11.2(1), 31.1, 31.3 and 50.5

First page of the pre-construction services agreement checklist

CHECKLIST

Pre-construction services agreement checklist

PDF, 2 pages

What to settle before signing a PCSA: the services, the fee, the standard the stage one programme must meet, the exit and the checks at award.

Covers: NEC4 ECC 11.2(1), 31.1 to 31.3, 31.4 (Option A), 50.5 and X22 (Options C and E), with JCT SBC 2016

First page of the schedule risk analysis checklist

CHECKLIST

Schedule risk analysis checklist

PDF, 2 pages

What a P80 date means and what it commits you to, from the model behind it to the risks that sit with the Client.

Covers: NEC4 ECC 30.1, 30.3, 31.3 and 60.1(3), (6), (12) and (13)

WHAT IT LOOKS LIKE WHEN WE DO IT

First page of the tender programme and narrative sample on a demo project

SAMPLE, DEMO PROJECT

Tender programme and narrative

PDF, 2 pages

Page one is the tender programme in Primavera P6. Page two is the narrative that goes in with the bid.

First page of the pre-construction pack sample on a demo project

SAMPLE, DEMO PROJECT

Pre-construction pack

PDF, 1 page

The contract clock and its dates, long-lead procurement against the dates needed, the constraints and the controls set up before site starts.

Prefer us to build it? See tender programmes and pre-construction planning.

accept

ACCEPT

Getting a programme accepted

Under NEC4 a compensation event's delay is assessed against the Accepted Programme current at its dividing date. These check each submission before it goes in.

TOOLS TO DO IT YOURSELF

First page of the NEC4 programme acceptance checklist

CHECKLIST

NEC4 programme acceptance checklist

PDF, 1 page

A check before a first programme or a revision goes in: the clause 31.2 content, the communication rules and the reply within two weeks.

Covers: NEC4 ECC 13.1, 13.2, 13.4, 31.1 to 31.3, 31.4 (Option A), 32.1, 32.2 and 50.5

First page of the FIDIC programme checklist

CHECKLIST

FIDIC programme checklist

PDF, 2 pages

Sub-Clause 8.3 items (a) to (k), the review periods and the four routes to a revised programme under FIDIC 2017.

Covers: FIDIC 2017 Sub-Clauses 1.5, 3.2, 8.3, 8.7, 13.3.1 and 20.2

First page of the DCMA 14-point checklist for NEC programmes

CHECKLIST

DCMA 14-point checklist for NEC programmes

PDF, 2 pages

The DCMA 14-point assessment read against NEC4, so each flag is fixed or explained before the Project Manager sees it.

Covers: the 14 DCMA checks with NEC4 ECC 11.2(1), 31.2, 31.3, 32.1 and 63.5

First page of the MS Project to Primavera P6 checklist

CHECKLIST

MS Project to Primavera P6 checklist

PDF, 1 page

For a contract that requires P6 when the programme was built in MS Project: the checks after the import and the files that go in.

Covers: NEC4 ECC 31.1 and 31.2, FIDIC 2017 8.3 and JCT SBC 2016 2.9.1.2

WHAT IT LOOKS LIKE WHEN WE DO IT

First page of the programme compliance review sample on a demo project

SAMPLE, DEMO PROJECT

Programme compliance review

PDF, 1 page

The nine clause 31.2 items checked, the four clause 31.3 reasons tested and the findings ranked by what would stop acceptance.

Prefer us to prepare it? See Clause 31 and 32 programmes.

control

CONTROL

Running updates, reporting and early warnings

When the update cycle slips, the dates stop meaning anything. These keep the early warnings, the reporting and the payment application in step with the programme.

TOOLS TO DO IT YOURSELF

NEC4 early warning register template in Excel, with example matters scored for time impact and proximity

TEMPLATE

NEC4 early warning register template

Excel workbook, 5 tabs

One row per matter, scored and linked to the programme, with the clause 15 timetable checked and the counts for the monthly report.

Covers: NEC4 ECC 11.2(8), 15.1 to 15.4, 61.5 and 63.7, with a note on NEC3

First page of the NEC4 payment application checklist

CHECKLIST

NEC4 payment application checklist

PDF, 2 pages

Before each assessment date and when the certificate arrives: the amount, the build-up, the notices and the interest.

Covers: NEC4 ECC 50.2, 50.5, 50.6, 51.1 to 51.4, 53, X7 and Y(UK)2

WHAT IT LOOKS LIKE WHEN WE DO IT

First page of the monthly reporting pack sample on a demo project

SAMPLE, DEMO PROJECT

Monthly reporting pack

PDF, 13 pages

One cycle's programme report, obstacles to completion tracker, four-week look-ahead and progress dashboard.

First page of the review and recovery note sample on a demo project

SAMPLE, DEMO PROJECT

Review and recovery note

PDF, 5 pages

The review note on where the job truly stands, with the recovery programme in Primavera P6 as its appendix.

Prefer us to run it? See project controls and reporting. If the dates have already slipped, see programme recovery.

protect

PROTECT

Dealing with change and delay

Time and money for change and delay depend on what was notified on time and what was recorded when it happened. These help you notify, build the evidence and assess the delay.

TOOLS TO DO IT YOURSELF

First page of the FIDIC extension of time checklist

CHECKLIST

FIDIC extension of time checklist

PDF, 2 pages

From the Programme the Claim relies on to the Notice of Claim, the fully detailed Claim and the Engineer's determination.

Covers: FIDIC 2017 Sub-Clauses 1.3, 3.7, 4.20, 8.3, 8.4, 8.5, 10.1 and 20.2

The NEC4 contract clock showing the dates that follow a compensation event notified on 9 November 2026

CALCULATOR

NEC4 contract clock

Online calculator, NEC4 ECC

Pick what happened and the date it happened to see every date that runs from it under the NEC4 ECC, with the clause and who has to act.

Covers: NEC4 ECC 30.2, 31.3, 51.1, 51.2, 53.1, 61.3, 61.4, 62.3, 62.4, 62.6, 64.3, 64.4 and Y(UK)2

WHAT IT LOOKS LIKE WHEN WE DO IT

First page of the compensation event time impact assessment sample on a demo project

SAMPLE, DEMO PROJECT

Compensation event time impact assessment

PDF, 2 pages

A compensation event assessed against the Accepted Programme current at the dividing date, with the impacted programme in Primavera P6.

Prefer us to assess it? See compensation events. For a claim or a dispute, see forensic delay analysis.

The checklists support your own review. They do not replace the contract or legal advice. Check each one against your contract, because Z clauses and Particular Conditions can change the clauses it cites.