top of page

PRICING

Construction Planning & Project Controls Pricing

Programmes that win work. Controls that protect margin.

Transparent starting prices for contractors and delivery teams working under NEC, JCT and FIDIC contracts. Every fee is matched to contract type, project stage, programme condition and reporting cadence, and confirmed in writing before work begins. No surprises, no lock-in.

NEC ACCREDITED

APMG QUALIFIED

P6 / MS PROJECT / ASTA

NEC / JCT / FIDIC

01

Contract-aware, not generic

Programmes built specifically for NEC3, NEC4, JCT and FIDIC requirements, not adapted from a template after the fact. Clause 31/32 alignment is built in from day one.

02

Issued under NEC-accredited governance

Every output (programme, narrative, reporting pack) passes an NEC-accredited governance check before issue, so what reaches your client or commercial team is controlled and defensible.

03

Scope confirmed before billing

Scope, fee, outputs and timeline are confirmed in writing before any work begins. Nothing is chargeable until you have agreed it.

WHY IT MATTERS

What a credible programme protects

NEC Cl.61.3 · FIDIC Cl.20.2

Time entitlement

Compensation events run on notification discipline. A missed eight-week notification under NEC clause 61.3 can time-bar the entitlement on that event.

FIDIC runs the same discipline harder: clause 20.2 gives 28 days. 

REPORTING & EV

Margin visibility

Change priced against a credible critical path is defensible. Change argued without one is negotiable. Disciplined reporting keeps the commercial position visible while it can still be corrected.

PACKAGES

Choose Your Starting Point

Four ways to engage, organised by what you need next: win the work, fix a programme that has slipped, keep delivery under control month to month, or defend time on a disputed event. Every fee is confirmed after a short scope call.

Starting prices are indicative and subject to scope, contract requirements and available project information. VAT, where applicable, is confirmed in the written proposal.

ONE-OFF
PRE-AWARD

TO WIN THE WORK

From £2,500

✔ Full tender programme built from the scope

✔ Narrative, phasing and milestone plan

✔ Key dates, sequencing and critical path

✔ Clarification defence support

If you win: the tender programme converts to your first Clause 31 contract programme at a pre-agreed fixed fee, if instructed within 30 days of award.

MOST ENGAGEMENTS START HERE
MONTHLY RETAINER

TO KEEP DELIVERY UNDER CONTROL

Live Controls Retainer

Monthly cycle

Single project, light cadence: monthly update, progress call, critical path and constraint check.

From £1,500/mo

Live controls

Regular updates, monthly reporting and look-aheads, interface and action tracking.

From £3,000/mo

Controls & change

Weekly updates, dashboards and KPIs, time-impact assessment, compensation event and claim support.

From £5,500/mo

FIXED-FEE ENTRY
DISPUTED TIME

TO ESTABLISH OR DEFEND A TIME POSITION

Forensic & Delay Analysis

Extension of time, compensation event and time impact analysis positions built from the native files and the records, ready for assessment, adjudication or proceedings.

From £2,500

Starts with a fixed-fee Position Review, completed within one week

✔ Records and native file audit

✔ Method memo before any analysis is built

✔ Written view of what the records support

✔ Full delay analysis and exhibits if instructed

WHERE THEY SIT

Compensation events, time impact analysis and extension of time

These run on a spectrum from routine to disputed. Where yours sits decides which engagement covers it, and there is no separate line item to buy.

LIVE AND PROSPECTIVE

Routine compensation event assessment, in-cycle time impact analysis and cooperative extension of time work are handled every reporting cycle inside the retainer, as part of the relationship rather than as a separate fee.

RETROSPECTIVE OR DISPUTED

A rejected EOT, a challenged CE quotation, a Clause 64 assessment or a claim reconstructed after the fact are scoped per event, and start with the fixed-fee Position Review that tells you where the records leave you.

Other service lines. Pre-construction planning, compensation event support and Clause 31/32 compliance are priced on their own service pages or scoped after a document review. See programme compliance →

DELIVERED

Applied on live projects

NEC3 OPTION A · £50M+ PACKAGE

Gas infrastructure reporting and controls

Monthly Clause 32 reporting cycle, earned value analysis, lookaheads and change integration through live delivery.

CARBON CAPTURE PLANT

A live baseline kept credible

Baseline maintained for commercial reporting while main contractor design information continued to move.

CHEMICAL PLANT SHUTDOWN

Zero tolerance for drift

A live shutdown coordinated across contractors running to different schedules, with change tracked against the programme.

HOW IT STARTS

What happens after you get in touch

Scope conversation

1

A 30-minute call to understand your contract, programme status, key dates and what you need. No preparation required.

NO CHARGE · NO OBLIGATION

Scope confirmed in writing

2

We confirm the scope, outputs, fee and timeline in writing before any work begins. You know exactly what you're getting and what it costs before you commit.

WRITTEN · NO SURPRISES

Work begins

3

Delivery starts to the agreed scope, with NEC-accredited governance on every output before it leaves us. Reporting and updates aligned to your project cadence.

NEC-ACCREDITED GOVERNANCE

GET STARTED

Not sure which package fits?

Tell us the contract type, project stage and the level of support you expect. We'll confirm the right package, and the smallest scope that still protects programme credibility and margin.

bottom of page