PRICING
Construction Planning & Project Controls Pricing
Programmes that win work. Controls that protect margin.
Transparent starting prices for contractors and delivery teams working under NEC, JCT and FIDIC contracts. Every fee is matched to contract type, project stage, programme condition and reporting cadence, and confirmed in writing before work begins. No surprises, no lock-in.
NEC ACCREDITED
APMG QUALIFIED
P6 / MS PROJECT / ASTA
NEC / JCT / FIDIC
01
Contract-aware, not generic
Programmes built specifically for NEC3, NEC4, JCT and FIDIC requirements, not adapted from a template after the fact. Clause 31/32 alignment is built in from day one.
02
Issued under NEC-accredited governance
Every output (programme, narrative, reporting pack) passes an NEC-accredited governance check before issue, so what reaches your client or commercial team is controlled and defensible.
03
Scope confirmed before billing
Scope, fee, outputs and timeline are confirmed in writing before any work begins. Nothing is chargeable until you have agreed it.
WHY IT MATTERS
What a credible programme protects
Time entitlement
Compensation events run on notification discipline. A missed eight-week notification under NEC clause 61.3 can time-bar the entitlement on that event.
FIDIC runs the same discipline harder: clause 20.2 gives 28 days.
Margin visibility
Change priced against a credible critical path is defensible. Change argued without one is negotiable. Disciplined reporting keeps the commercial position visible while it can still be corrected.
PACKAGES
Choose Your Starting Point
Four ways to engage, organised by what you need next: win the work, fix a programme that has slipped, keep delivery under control month to month, or defend time on a disputed event. Every fee is confirmed after a short scope call.
Starting prices are indicative and subject to scope, contract requirements and available project information. VAT, where applicable, is confirmed in the written proposal.
TO WIN THE WORK
From £2,500
✔ Full tender programme built from the scope
✔ Narrative, phasing and milestone plan
✔ Key dates, sequencing and critical path
✔ Clarification defence support
If you win: the tender programme converts to your first Clause 31 contract programme at a pre-agreed fixed fee, if instructed within 30 days of award.
TO FIX A SLIPPING PROGRAMME
From £2,000
✔ Logic and sequencing clean-up
✔ Critical path stabilisation
✔ Recovery options and action plan
✔ Reset narrative and handover
TO KEEP DELIVERY UNDER CONTROL
Live Controls Retainer
Monthly cycle
Single project, light cadence: monthly update, progress call, critical path and constraint check.
From £1,500/mo
Live controls
Regular updates, monthly reporting and look-aheads, interface and action tracking.
From £3,000/mo
Controls & change
Weekly updates, dashboards and KPIs, time-impact assessment, compensation event and claim support.
From £5,500/mo
TO ESTABLISH OR DEFEND A TIME POSITION
Forensic & Delay Analysis
Extension of time, compensation event and time impact analysis positions built from the native files and the records, ready for assessment, adjudication or proceedings.
From £2,500
Starts with a fixed-fee Position Review, completed within one week
✔ Records and native file audit
✔ Method memo before any analysis is built
✔ Written view of what the records support
✔ Full delay analysis and exhibits if instructed
WHERE THEY SIT
Compensation events, time impact analysis and extension of time
These run on a spectrum from routine to disputed. Where yours sits decides which engagement covers it, and there is no separate line item to buy.
LIVE AND PROSPECTIVE
Routine compensation event assessment, in-cycle time impact analysis and cooperative extension of time work are handled every reporting cycle inside the retainer, as part of the relationship rather than as a separate fee.
RETROSPECTIVE OR DISPUTED
A rejected EOT, a challenged CE quotation, a Clause 64 assessment or a claim reconstructed after the fact are scoped per event, and start with the fixed-fee Position Review that tells you where the records leave you.
Other service lines. Pre-construction planning, compensation event support and Clause 31/32 compliance are priced on their own service pages or scoped after a document review. See programme compliance →
DELIVERED
Applied on live projects
NEC3 OPTION A · £50M+ PACKAGE
Gas infrastructure reporting and controls
Monthly Clause 32 reporting cycle, earned value analysis, lookaheads and change integration through live delivery.
CARBON CAPTURE PLANT
A live baseline kept credible
Baseline maintained for commercial reporting while main contractor design information continued to move.
CHEMICAL PLANT SHUTDOWN
Zero tolerance for drift
A live shutdown coordinated across contractors running to different schedules, with change tracked against the programme.
HOW IT STARTS
What happens after you get in touch
Scope conversation
1
A 30-minute call to understand your contract, programme status, key dates and what you need. No preparation required.
Scope confirmed in writing
2
We confirm the scope, outputs, fee and timeline in writing before any work begins. You know exactly what you're getting and what it costs before you commit.
Work begins
3
Delivery starts to the agreed scope, with NEC-accredited governance on every output before it leaves us. Reporting and updates aligned to your project cadence.
