Planning advice for contractors
Analysis and commentary on NEC programmes, compensation events, tender planning and project controls. Written for Tier 1 and Tier 2 contractors.
Search


Winning NEC bids as a small or specialist contractor: closing the evidence gap that costs you work
A specialist M&E subcontractor with twenty years of delivery experience lost an NEC4 framework bid to a larger competitor with a thinner track record. The debrief was instructive. The gap was not price or technical approach. It was the planning and programme response. The larger competitor evidenced delivery confidence through a logic-linked tender programme. The specialist asserted it through a narrative of experience.

Roman Bazelchuk
Sep 1, 202512 min read


Time risk allowance in NEC: what counts as reasonable
Most contractors treat time risk allowances as a presentational question: how much contingency to show and how to stop the project manager challenging it. The framing misses what TRA actually is. A time risk allowance is the only risk provision in the programme the contract explicitly protects: it is retained when compensation events are assessed, while risk hidden inside padded durations is silently consumed by the impact arithmetic, event after event.

Roman Bazelchuk
Aug 28, 202511 min read


Do small industrial contractors need to submit a tender programme?
A tender programme is required when the invitation to tender asks for one, and in practice when the quality evaluation scores it. Where neither applies it is still worth building, because it sets the durations behind every time-related cost in the price. This guide covers what a tender programme is, how it fits into the tender period, how it differs from the clause 31 programme after award, and a checklist to run before it goes in.

Roman Bazelchuk
Aug 9, 202518 min read


Assessing NEC4 compensation events: 5 judgement calls
Give the same compensation event to two competent planners. Same accepted programme, same dividing date, same facts. One comes back with three weeks of delay to planned Completion. The other comes back with nine days. Both can defend their model. Neither has made an arithmetic error. The difference is five judgement calls that sit inside every NEC4 delay assessment, that the contract deliberately leaves open, and that most contractors make silently.

Roman Bazelchuk
Aug 3, 202513 min read


NEC delivery for specialist contractors: the operating model that decides margin
A specialist contractor wins an NEC package on the work it can do, and keeps the margin on something else: how the programme, the early warning rhythm and the change record hold up across the job. This is the operating model that decides which, phase by phase.

Roman Bazelchuk
Jul 20, 20259 min read


Why M&E contractors lose commercial protection early under NEC
On NEC, M&E margin is often lost in the silent gap between a builder's delay and a contractor's commissioning window.

Roman Bazelchuk
Jun 9, 20258 min read


Why Specialist Contractors Lose Margin on NEC Jobs
Specialist contractors rarely lose money on NEC jobs because they cannot build. More often, they lose it when the accepted programme stops reflecting reality and the change record is too weak to defend. This article looks at where that happens and how stronger programme discipline protects margin and repeat work.

Roman Bazelchuk
Jun 9, 202511 min read