Planning advice for contractors
Analysis and commentary on NEC programmes, compensation events, tender planning and project controls. Written for Tier 1 and Tier 2 contractors.
Search
All Articles


Remote NEC planning support: how UK contractors are accessing scarce expertise the labour market cannot supply
The UK construction sector has committed to delivering £718 billion of work over the next decade against a labour market that the Construction Industry Training Board projects will need an additional 239,300 workers between 2025 and 2029 just to meet the requirement. Senior NEC planning capability sits inside that shortage. The conventional view of remote planning support positions it as a cost-saving arrangement or a small-contractor accommodation. Both framings understate w

Roman Bazelchuk
Nov 5, 202510 min read


NEC4 programme compliance: the three commercial exposures that compound when contractors get it wrong
UK adjudication data records 2,264 referrals between May 2023 and April 2024, with inadequate contract administration identified as the leading cause of disputes at 50 per cent of cases. Behind that figure sits a pattern most experienced commercial directors recognise. Contractors with weak NEC4 programme compliance lose disproportionately on change assessment, on delay narratives, on cashflow timing, and on tender evaluation. The losses are not random.

Roman Bazelchuk
Nov 1, 202510 min read


Seven ways contractors lose entitlement on NEC4 compensation events, and the discipline that protects it
Every contractor running an NEC4 contract loses some compensation event entitlement that the contract would otherwise have delivered. The amount lost is not random. It is the predictable consequence of seven specific failure modes that recur across contractor types, contract sizes and sectors. Each is preventable through operational discipline.

Roman Bazelchuk
Sep 4, 202515 min read


Winning NEC bids as a small or specialist contractor: closing the evidence gap that costs you work
A specialist M&E subcontractor with twenty years of delivery experience lost an NEC4 framework bid to a larger competitor with a thinner track record. The debrief was instructive. The gap was not price or technical approach. It was the planning and programme response. The larger competitor evidenced delivery confidence through a logic-linked tender programme. The specialist asserted it through a narrative of experience.

Roman Bazelchuk
Sep 1, 202512 min read


The hidden cost of weak planning: how specialist contractors lose the margin they won
The dangerous moment for a specialist contractor on an NEC project is not losing the bid. It is winning it. Losing a bid costs nothing but the bid effort. Winning a bid the contractor cannot then administer properly costs the margin the work was supposed to deliver. The specialist mobilises, the team gets on with the work they are good at, the project completes, and the expected profit is not there. The reasons are spread across the project life in small increments nobody fla

Roman Bazelchuk
Aug 30, 202510 min read


Time risk allowances in NEC: the only risk provision the contract actually protects
Most contractors treat time risk allowances as a presentational question: how much contingency to show and how to stop the project manager challenging it. The framing misses what TRA actually is. A time risk allowance is the only risk provision in the programme the contract explicitly protects: it is retained when compensation events are assessed, while risk hidden inside padded durations is silently consumed by the impact arithmetic, event after event.

Roman Bazelchuk
Aug 28, 202510 min read


Do small industrial contractors need to submit a tender programme?
Whether a small industrial contractor needs to submit a tender programme depends on which of three situations the bid sits in: required by the ITT, scored in the quality evaluation, or genuinely optional. The first two answer themselves. The third is where most small contractors get the decision wrong, because the strongest reason for building a tender programme has nothing to do with the evaluator at all. It is about the price.

Roman Bazelchuk
Aug 9, 202510 min read


Assessing NEC4 compensation events: the five judgement calls that decide how much delay you recover
Give the same compensation event to two competent planners. Same accepted programme, same dividing date, same facts. One comes back with three weeks of delay to planned Completion. The other comes back with nine days. Both can defend their model. Neither has made an arithmetic error. The difference is five judgement calls that sit inside every NEC4 delay assessment, that the contract deliberately leaves open, and that most contractors make silently.

Roman Bazelchuk
Aug 3, 202512 min read


NEC delivery for specialist contractors: the operating model that decides margin
A specialist contractor wins an NEC package on the work it can do, and keeps the margin on something else: how the programme, the early warning rhythm and the change record hold up across the job. This is the operating model that decides which, phase by phase.

Roman Bazelchuk
Jul 20, 20259 min read