Planning advice for contractors
Analysis and commentary on NEC programmes, compensation events, tender planning and project controls. Written for Tier 1 and Tier 2 contractors.
Search


NEC4 compensation events without an accepted programme: how contractors protect entitlement when the baseline is missing
An accepted programme is not a procedural document. It is the shared reference frame against which every compensation event is assessed, every delay analysed, every progress conversation grounded. When it is missing, the reference frame itself becomes contested, and that contest favours the project manager. This is what the absence of an accepted programme actually means commercially, why it shifts control, and how contractors recover the position before the damage compounds.

Roman Bazelchuk
Feb 2017 min read


NEC4 compensation events: how to get quotations agreed and what makes them acceptable to the project manager
Most contractors ask how to get NEC4 compensation event quotations agreed. The question is the wrong one. The strongest contractors ask what makes a quotation acceptable to a project manager who wants to accept it and what makes a quotation rejectable by a project manager looking for reasons to reject. The first optimises for completeness. The second optimises for acceptability. The two are not the same.

Roman Bazelchuk
Feb 1017 min read


Managing subcontractor delay under NEC4: why every supply chain slip is two delays at once
Every subcontractor delay on an NEC4 project is two delays at once. The subcontract event runs on its own clock with its own notification requirements, evidence, and commercial outcomes. The head contract event runs on a parallel clock with its own clause 61.3 window, its own assessment, and its own clause 64 vulnerability. Most contractors run one of these processes diligently and the other partially or not at all.

Roman Bazelchuk
Feb 314 min read


How to score higher on Social Value in construction tenders
Evaluators have seen thousands of Social Value statements. The difference between a low score and a high one is rarely intent. It is evidence, deliverability, and a clear audit trail. This article explains what PPN 002 and the Social Value Model actually require, why most tender answers still fall short, and what a contract-linked jobs-and-skills commitment needs to stand up to post-award scrutiny.

Roman Bazelchuk
Jan 2911 min read


Pre-construction planning for contractors: the practical guide to designing the system before you run it
There is a four-to-twelve-week window between contract award and site mobilisation that the contractor's commercial outturn depends on more than any other stage of delivery. It is unremarkable in most calendars and rarely discussed at board level. Yet what gets set up during this window will determine, more than any subsequent decision, whether the project's commercial position is defensible at month eighteen. Pre-construction is not preparation.

Roman Bazelchuk
Jan 2217 min read


How NEC tender bids are scored: what evaluators actually write down
An NEC tender bid is scored question by question, and the courts have read what evaluators wrote. This guide follows four real cases, from a road interchange tendered on NEC3 to an NEC4 programme question, shows how close the scores run, explains the assessment summary each assessed bidder now receives, and sets out what to check in a tender programme before it goes in.

Roman Bazelchuk
Jan 1913 min read


Why Excel cannot run an NEC programme: the calculation problem nobody talks about
Excel is not a planning tool. It is a calculation tool with planning-shaped output. NEC contracts are built on logic recalculation. The seven recurring pitfalls of Excel programmes on NEC projects are not seven separate problems with seven separate fixes. They are seven symptoms of one structural mismatch between the category of tool and the category of contract. This is the complete analysis: why Excel cannot perform the contractual functions.

Roman Bazelchuk
Jan 1418 min read


The History of NEC: What It Means for Contractors’ Programmes and Project Controls
NEC did not arrive fully formed. It evolved as a deliberate response to the failures of the contracts that preceded it, and every clause in the current NEC4 suite carries the imprint of a specific problem that JCT and ICE could not solve. The history is not background to contemporary NEC practice. It is the explanation of why the controls matter, what the contract was designed to prevent, and how contractors who understand the evolution administer the contract more effectivel

Roman Bazelchuk
Jan 126 min read


UK industrial construction tenders: how to bid into AMP8, RIIO-3 and the energy transition pipeline
Water, power networks, carbon capture and nuclear have well over £100 billion of approved spending ahead of them, most of it on assets that have to keep running. Those tenders are not won on the same things as a school or an office. They turn on outage windows the client booked long ago and on equipment that can take two years to make. What evaluators check in an industrial tender programme, and how it becomes the contract baseline under NEC4.

Roman Bazelchuk
Dec 30, 202511 min read