FIDIC 1999 vs 2017: Clause Mapping for Programme and Claims
Most of what changed between the 1999 and 2017 FIDIC conditions is a clause number. The problem is the templates that were never updated: on a 2017 contract, a notice citing Sub-Clause 8.4 for an extension of time is citing the advance warning provision instead.

Roman Bazelchuk
Oct 198 min read


The FIDIC Programme: What Sub-Clause 8.3 Actually Requires
FIDIC does not ask anyone to approve the programme. It asks the Engineer to review it, and gives a period in which to object. Let the period pass and a Notice of No-objection is deemed given, so the defined Programme exists whether anybody meant to create one or not. This guide covers what Sub-Clause 8.3 of the 2017 books requires, how the review works, and when and how the programme is revised.

Roman Bazelchuk
Oct 214 min read


FIDIC extension of time: Sub-Clause 8.5, the 20.2 claim and the programme behind it
A FIDIC extension of time is decided on the programme and the records. This guide takes the 2017 Red and Yellow Books from the planner's side: the Sub-Clause 8.5 grounds and what each carries, the Notice of Claim and fully detailed Claim under 20.2 with the Engineer's 14 days and the late-submission review, the 42 plus 42 days under 3.7, concurrent delay, the programme evidence that wins the days, and what an EU grant adds on funded work.

Roman Bazelchuk
Jun 2717 min read


The Contractor Performance Dashboard: the Smartest Way to Deliver NEC & FIDIC Projects
Most construction delivery teams still rely on fragmented spreadsheets, scattered emails and static PDF reports that take hours to compile and rarely tell the full story. The Contractor Performance Dashboard consolidates everything a Project Manager, Planner, QS or Site Manager needs into one coherent view: live SPI tracking, plan-versus-actual S-curves, structured obstacle logs, work-pack variance, four-week lookahead and compensation event evidence.

Roman Bazelchuk
Dec 15, 202510 min read


FIDIC vs NEC: Why Contractors Keep Making the Same Mistakes
FIDIC vs NEC is not about which contract is better. NEC tests a contractor's programme dialogue, FIDIC its contemporary records. This guide compares the FIDIC 2017 Red Book and NEC4 clause by clause on programme review, revisions, warnings, notices, delay assessment and delay damages, with JCT alongside, and shows where contractors moving between the two forms go wrong.

Roman Bazelchuk
Dec 5, 202522 min read