NEC programme control guides
How to get a programme accepted under clause 31, keep it accepted through clause 32 revisions and use it to protect time and money. Written for planners and project managers running live NEC jobs.
Search


Construction Planning: Win Work and Survive Delivery
There was a time when a construction programme could survive as a polite fiction. That time is ending. In modern UK construction, the programme has quietly become the document that reveals whether a contractor is genuinely managing time or simply explaining it after the event. The dividing line is no longer between firms with newer software and firms with older software. It is between firms that maintain a believable live time position and firms that periodically reconstruct
Dec 26, 202510 min read


FIDIC vs NEC: Why Contractors Keep Making the Same Mistakes
FIDIC vs NEC is not about which contract is better. NEC tests a contractor's programme dialogue, FIDIC its contemporary records. This guide compares the FIDIC 2017 Red Book and NEC4 clause by clause on programme review, revisions, warnings, notices, delay assessment and delay damages, with JCT alongside, and shows where contractors moving between the two forms go wrong.
Dec 5, 202522 min read


NEC4 cashflow: why the programme is a financial instrument, not just a delivery plan
A contractor seven months into a £35 million NEC4 contract is financing £4.2 million of working capital. The work is on programme. The technical performance is sound. The cashflow position is not. Three teams diagnose three different causes and none of them identifies what is actually happening.
Nov 29, 202513 min read


NEC4 programme compliance: the three commercial exposures that compound when contractors get it wrong
UK adjudication data records 2,264 referrals between May 2023 and April 2024, with inadequate contract administration identified as the leading cause of disputes at 50 per cent of cases. Behind that figure sits a pattern most experienced commercial directors recognise. Contractors with weak NEC4 programme compliance lose disproportionately on change assessment, on delay narratives, on cashflow timing, and on tender evaluation. The losses are not random.
Nov 1, 202510 min read


Time risk allowance in NEC: what counts as reasonable
Most contractors treat time risk allowances as a presentational question: how much contingency to show and how to stop the project manager challenging it. The framing misses what TRA actually is. A time risk allowance is the only risk provision in the programme the contract explicitly protects: it is retained when compensation events are assessed, while risk hidden inside padded durations is silently consumed by the impact arithmetic, event after event.
Aug 28, 202511 min read


NEC delivery for specialist contractors: the operating model that decides margin
A specialist contractor wins an NEC package on the work it can do, and keeps the margin on something else: how the programme, the early warning rhythm and the change record hold up across the job. This is the operating model that decides which, phase by phase.
Jul 20, 20259 min read


Why M&E contractors lose commercial protection early under NEC
On NEC, M&E margin is often lost in the silent gap between a builder's delay and a contractor's commissioning window.
Jun 9, 20258 min read