top of page

NEC ACCREDITED | APMG PROJECT PLANNING AND CONTROL

NEC planning and project controls consultancy for UK contractors

Protect the margin you won the job on, from tender to completion, under NEC, JCT or FIDIC.

“

Accurate, on time, and it gave our team and the client what they needed.

Studley Engineering logo

Charlie Brierton

Project Manager, Studley Engineering

“

Their support has given us confidence in our programme and claims position, and I wouldn’t hesitate to recommend them.

JWA Shopfitting Solutions logo

Roger Hills

Director and Contract Manager, JWA Shopfitting Solutions

Project planning and project controls services

Project planning services for contractors on NEC, JCT and FIDIC work, with programmes in Primavera P6, MS Project or Asta. Each service is scoped to the job, checked by an NEC Accredited Project Manager before issue and priced in writing before any chargeable work.

Logic-linked tender programmes and narratives written to the contract, solid enough to become the baseline after award.

Tender narrative and tender programme in Primavera P6, demo project
Tender programmes and tender support

Programme, interfaces and long-lead procurement set up between award and site start, so the team can run it from day one.

Pre-construction pack and long-lead procurement schedule, demo project
Pre-construction planning

Programmes that show all nine items clause 31.2 requires, checked against the four reasons for non-acceptance in clause 31.3.

Clause 31.2 programme compliance review and the NEC4 programme acceptance checklist
NEC clause 31 and 32 programmes

Programme updates, lookaheads, dashboards and reporting packs to an agreed cadence. Remote, hybrid or embedded.

Monthly programme report and progress S-curve, demo project
Construction project controls and reporting

An independent review, then logic, critical path and float rebuilt into a recovery programme the team can trust again.

Programme review and recovery note with the recovery programme in Primavera P6, demo project
Programme recovery

Notifications, quotations and time impact assessments built on the Accepted Programme, with the equivalent under JCT and FIDIC.

Compensation event time impact assessment with the impacted programme in Primavera P6, demo project
NEC3 and NEC4 compensation event support

Where a programme makes or loses money

Four moments decide it.

Win the work

A credible tender programme helps win the bid and becomes a baseline you can deliver.

Protect the margin

Compensation events assessed on the programme, so the entitlement is defensible.

Keep control

A programme kept current every month, so delays show while there is still time to act.

Stand up under audit

A clean evidence trail at acceptance, in assessment and in dispute.

Applied in practice across the full lifecycle. Tender, baseline, live reporting, change control and recovery delivered on a £50M+ NEC3 gas infrastructure package, a £20M carbon capture facility, a £10M grain processing shutdown and a £5M chemical processing shutdown. See project case studies

Real project controls outputs

Anonymised extracts from live jobs. Full examples are shared privately during scoping, where confidentiality allows.

Obstacle tracker

Obstacle tracker

Open obstacles with owners, target dates and the activities they hold up.

Four-week lookahead

Four-week lookahead

The next four weeks from the live programme, by area and trade, for the site team.

Anonymised monthly programme report

Project controls programme report

The month's position: planned Completion, Key Dates, what moved them and what is needed from others.

Anonymised baseline programme extract with the critical path

Baseline programme

Logic-linked in P6, MS Project or Asta, with the critical path shown.

Anonymised monthly progress dashboard with S-curve and progress by workfront

Live reporting dashboard

Progress, S-curves, variance commentary and management reporting.

Four ways to start

Most engagements start with a single deliverable, then move to a monthly cycle. Scope and fee are confirmed in writing before billing.

Programme review

Before you submit, accept or revise a programme.

Single deliverable

You need one output by a set date.

Monthly retainer

You need continuity through delivery without an in-house hire.

From £1,400 a month + VAT

Multi-project support

You run a framework or a portfolio and need planning capacity you can rely on.

A specialist NEC planning consultancy with senior review on every output

£750M+

Of projects planned, from a £1.5M shutdown to a £500M transmission project.

NEC4

Your programme reviewed by an NEC Accredited Project Manager, the way your PM will read it.

5,000

Activities in one P6 master programme, built and run from design to handover.

48 hrs

From the first call to a fixed fee in writing.

SOCIAL VALUE

Meet your jobs and skills commitment by hiring a permanent project planner.

From January 2027, central government tenders from £1m weight social value at 10 per cent or more, with jobs and skills at the centre. A permanent planning job is a commitment you can deliver and prove.

A University of Birmingham policy report, launched in Parliament on 3 November 2026, features the model as an example of best practice.

Sectors we work in

Experience across energy, utilities, infrastructure, process and specialist construction.

Focus for new work: carbon capture, hydrogen and AMP8.

necps-icon-sector-power-renewables.png

Power & Renewables

Generation · Grid

necps-icon-sector-oil-gas.png

Oil & Gas

Upstream · Downstream

necps-icon-sector-carbon-capture.png

​Carbon Capture

CCUS

necps-icon-sector-data-centres.png

Data Centres

Hyperscale · Colo

necps-icon-sector-water-utilities.png

Water & Utilities

AMP · Framework

necps-icon-sector-transportation.png

Transportation

Rail · Aviation

necps-icon-sector-industrial.png

Industrial

Process · Chemical · Food

NEC programme guides

What clause 31.2 says your programme must show, the four reasons it can be rejected and how deemed acceptance works.

NEC clause 31 programme acceptance guide for contractors
NEC clause 31 programme acceptance

The event is valid. The entitlement still goes. Seven ways it happens on NEC4 jobs, starting with the clause 61.3 time bar.

7 ways contractors lose entitlement on NEC4 compensation events
7 ways contractors lose NEC4 compensation events

NEC does not do extensions of time the JCT way. Each event is assessed against the Accepted Programme at the dividing date.

NEC delay analysis and extension of time guide for contractors
NEC delay analysis and extension of time

Arrange a consultation

The first consultation is confidential and takes 30 minutes, with no documents needed in advance. We cover your project, contract, software and reporting, then send a fixed-scope proposal within 48 hours.

​

Scope confirmed before billing

bottom of page