Planning advice for contractors
Analysis and commentary on NEC programmes, compensation events, tender planning and project controls. Written for Tier 1 and Tier 2 contractors.
Search


Hong Kong Edition compensation events: what changes from standard NEC4
Hong Kong's edition of the NEC4 ECC keeps the standard compensation event procedure and changes much of what sits around it. Weather becomes a list of Observatory warnings, labour shortage becomes an event, and on government contracts several events pay time only while the Project Manager can take six weeks to reply. This guide sets each change against the standard form, explains actual cost on Options A and B, and shows how a disputed event reaches adjudication under Cap. 65

Roman Bazelchuk
2 days ago15 min read


Hong Kong NEC4 ECC: programme compliance under the 2023 HK Edition
Hong Kong has now used the NEC form on more than 850 public works contracts and, since July 2023, has its own stand-alone edition of the ECC. The Hong Kong Edition re-engineers payment timing, compensation event assessment and dispute resolution, and every change lands on the programme. This is what the 2023 edition changes at programme level, where first submissions fail acceptance, and what a defensible programme contains.

Roman Bazelchuk
Jun 129 min read


UK industrial construction tenders: how to bid into AMP8, RIIO-3 and the energy transition pipeline
Water, power networks, carbon capture and nuclear have well over £100 billion of approved spending ahead of them, most of it on assets that have to keep running. Those tenders are not won on the same things as a school or an office. They turn on outage windows the client booked long ago and on equipment that can take two years to make. What evaluators check in an industrial tender programme, and how it becomes the contract baseline under NEC4.

Roman Bazelchuk
Dec 30, 202511 min read


The future of NEC contracts: what the 2035 administrative model is starting to look like
NEC contract administration today still works the way it worked in 1993. A programme gets submitted as a document. The project manager reviews it as a document. Acceptance is recorded as a document. The contractual machinery is electronic in form and paper in function. This is changing faster than most contractors have absorbed, and not in the way the industry talks about.

Roman Bazelchuk
Nov 28, 202516 min read


Remote NEC planning support: do you need a full-time planner?
An NEC job won, the first programme due and the planning seat empty. This guide compares four ways to cover the seat, shows the weekly lookahead, obstacle list and monthly report that remote NEC planning support delivers, and says plainly when a full-time planner is the better choice.

Roman Bazelchuk
Nov 5, 202511 min read