Planning advice for contractors
Analysis and commentary on NEC programmes, compensation events, tender planning and project controls. Written for Tier 1 and Tier 2 contractors.
Search


PPN 026: What a Social Value Commitment Has to Survive
Most of the commentary on PPN 026 has led with the 20 per cent weighting. It is the wrong headline. What changed is that the menu is gone, and that on the larger contracts the commitment you write becomes a KPI somebody publishes and reports on every year.

Roman Bazelchuk
Sep 249 min read


Why Your Programme Narrative Is the Part Evaluators Actually Read
The programme schedule goes to the planner. The programme narrative goes to the decision-maker. Most contractors write one that describes the Gantt rather than argues the case. Here is why that costs them at clarification and what a strong narrative actually does.

Roman Bazelchuk
Apr 139 min read


How to score higher on Social Value in construction tenders
Evaluators have seen thousands of Social Value statements. The difference between a low score and a high one is rarely intent. It is evidence, deliverability, and a clear audit trail. This article explains what PPN 002 and the Social Value Model actually require, why most tender answers still fall short, and what a contract-linked jobs-and-skills commitment needs to stand up to post-award scrutiny.

Roman Bazelchuk
Jan 2911 min read


Pre-construction planning for contractors: the practical guide to designing the system before you run it
There is a four-to-twelve-week window between contract award and site mobilisation that the contractor's commercial outturn depends on more than any other stage of delivery. It is unremarkable in most calendars and rarely discussed at board level. Yet what gets set up during this window will determine, more than any subsequent decision, whether the project's commercial position is defensible at month eighteen. Pre-construction is not preparation.

Roman Bazelchuk
Jan 2217 min read


How NEC tender bids are scored: what evaluators actually write down
An NEC tender bid is scored question by question, and the courts have read what evaluators wrote. This guide follows four real cases, from a road interchange tendered on NEC3 to an NEC4 programme question, shows how close the scores run, explains the assessment summary each assessed bidder now receives, and sets out what to check in a tender programme before it goes in.

Roman Bazelchuk
Jan 1913 min read


The History of NEC: What It Means for Contractors’ Programmes and Project Controls
NEC did not arrive fully formed. It evolved as a deliberate response to the failures of the contracts that preceded it, and every clause in the current NEC4 suite carries the imprint of a specific problem that JCT and ICE could not solve. The history is not background to contemporary NEC practice. It is the explanation of why the controls matter, what the contract was designed to prevent, and how contractors who understand the evolution administer the contract more effectivel

Roman Bazelchuk
Jan 126 min read


UK industrial construction tenders: how to bid into AMP8, RIIO-3 and the energy transition pipeline
Water, power networks, carbon capture and nuclear have well over £100 billion of approved spending ahead of them, most of it on assets that have to keep running. Those tenders are not won on the same things as a school or an office. They turn on outage windows the client booked long ago and on equipment that can take two years to make. What evaluators check in an industrial tender programme, and how it becomes the contract baseline under NEC4.

Roman Bazelchuk
Dec 30, 202511 min read


Construction Planning: Win Work and Survive Delivery
There was a time when a construction programme could survive as a polite fiction. That time is ending. In modern UK construction, the programme has quietly become the document that reveals whether a contractor is genuinely managing time or simply explaining it after the event. The dividing line is no longer between firms with newer software and firms with older software. It is between firms that maintain a believable live time position and firms that periodically reconstruct

Roman Bazelchuk
Dec 26, 202510 min read


The Contractor Performance Dashboard: the Smartest Way to Deliver NEC & FIDIC Projects
Most construction delivery teams still rely on fragmented spreadsheets, scattered emails and static PDF reports that take hours to compile and rarely tell the full story. The Contractor Performance Dashboard consolidates everything a Project Manager, Planner, QS or Site Manager needs into one coherent view: live SPI tracking, plan-versus-actual S-curves, structured obstacle logs, work-pack variance, four-week lookahead and compensation event evidence.

Roman Bazelchuk
Dec 15, 202510 min read


Social value in construction: what it is, how it is scored and why commitments fail
Social value in construction is the benefit a contractor commits to deliver through a contract, scored at tender and monitored through delivery. This guide covers the law and policy behind it, what scores under PPN 026 from January 2027, why commitments fail, and how jobs and skills commitments are delivered and evidenced on a live project, from the roles in the programme to the records each KPI assessment asks for.

Roman Bazelchuk
Dec 1, 202514 min read


Winning NEC bids as a small or specialist contractor: closing the evidence gap that costs you work
A specialist M&E subcontractor with twenty years of delivery experience lost an NEC4 framework bid to a larger competitor with a thinner track record. The debrief was instructive. The gap was not price or technical approach. It was the planning and programme response. The larger competitor evidenced delivery confidence through a logic-linked tender programme. The specialist asserted it through a narrative of experience.

Roman Bazelchuk
Sep 1, 202512 min read


Do small industrial contractors need to submit a tender programme?
A tender programme is required when the invitation to tender asks for one, and in practice when the quality evaluation scores it. Where neither applies it is still worth building, because it sets the durations behind every time-related cost in the price. This guide covers what a tender programme is, how it fits into the tender period, how it differs from the clause 31 programme after award, and a checklist to run before it goes in.

Roman Bazelchuk
Aug 9, 202518 min read


NEC delivery for specialist contractors: the operating model that decides margin
A specialist contractor wins an NEC package on the work it can do, and keeps the margin on something else: how the programme, the early warning rhythm and the change record hold up across the job. This is the operating model that decides which, phase by phase.

Roman Bazelchuk
Jul 20, 20259 min read