top of page

Search


7 Common Pitfalls When Contractors Use Excel Programmes on NEC Jobs
Excel is great for registers and dashboards, but risky as the master NEC programme. Here are 7 pitfalls that undermine cause and effect, plus fixes using a lean logic linked schedule.
Jan 144 min read


7 Common Pitfalls When Managing NEC4 Compensation Events as a Contractor
Contractors lose entitlement on NEC4 Compensation Events when the process is loose: missed 8-week time bar, wrong Accepted Programme at the dividing date, weak notices and quotations with no programme story. Here are 7 pitfalls and the controls that fix them.
Sep 4, 20259 min read


5 Time Risk Allowance Mistakes That Undermine NEC Programme Acceptance
Time Risk Allowances are not padding. Under NEC, they are part of realistic planning. Clause 31.2 requires the contractor’s programme to show float and time risk allowances, and the NEC guidance is clear that where reasonable TRA is missing, unclear or not shown properly, the Project Manager has grounds not to accept the programme because it does not represent the contractor’s plans realistically or does not show the information the contract requires. That sounds technical, b
Aug 28, 20256 min read
bottom of page